Preprint / Version 1

Factors Affecting the Performance in the Implementation of Government Building Construction Projects: A Case Study in Bole Sub- City of Addis Ababa

##article.authors##

DOI:

https://doi.org/10.31224/osf.io/bd3es

Keywords:

Construction Industry, Correlation technique, Essential factors, Project performance, Public building project

Abstract

Building project implementation has so many issues and complex performance, such as time, cost, quality, and safety. This study identified and assessed the essential factors influencing the implementation of public building projects, particularly in the Bole Sub-city of Addis Ababa. There were 46 factors identified, validated, and divided into 9 categories. Questionnaires are distributed to 120 respondents, of which 8 for owners, 25 for consultants, 86 for contractors, and one head of the office. The key factors decided upon were: liquidity of the organization, improved availability of commodity prices for people with high experience and expertise, and the quality of equipment and raw materials in the project. The agreement between the parties on the ranking of factors was calculated based on their Relative Importance Index. Besides, the value of the Cronbach’s Alpha for variables calculated above 0.7, which means the data and scale are reliable and accepted for further analysis to correlate the different groups of factors. Results showed that cost, time, quality, productivity, and customer satisfaction are the top five essential factors affecting the performance of the government public building in the study area.

Downloads

Download data is not yet available.

Downloads

Posted

2020-11-30