The Fiscal Cost of Energy Insecurity: Import Expenditure versus Forgone Export Revenue after the 2026 Bhote Koshi Disaster in Nepal
DOI:
https://doi.org/10.31224/8832Abstract
On 26 August 2026 a glacial-origin debris flood on the Bhote Koshi River removed about 432 MW of capacity from Nepal’s Trishuli corridor, destroyed its 220 kV evacuation hub and delayed a further 495 MW under construction, weeks after the country’s largest electricity trade surplus. This paper quantifies the fiscal cost in two ledgers built from plant-level generation and revenue records. The first values forgone generation over each plant’s repair or outage period: 14,274 GWh, worth USD 988 million at the Nepal Electricity Authority’s average domestic sales realisation, comprising a net USD 581 million to the utility and USD 407 million in producers’ contracted revenue. The annual loss begins at 4,469 GWh (USD 309 million) and reaches zero only in the fifth year. The second traces the cross-border trade account over the first year: a net cost to the utility of NPR 8.39 billion (USD 60 million; range NPR 6.98–12.27 billion), or 44 per cent of the FY 2082/83 trade surplus. The loss arrives first as forgone exports and shifts from mid-December to dry-season imports priced some 54 per cent above the forgone export realisation. Capacity stranded by transmission loss alone accounts for 41 per cent of the energy lost in the first six months, so much of the near-term loss is recoverable through transmission reconstruction without rebuilding powerhouses. The findings support prioritising the Trishuli 3B Hub reconnection, transmission redundancy in cascade corridors, storage-backed export contracts, a fixed-price emergency import tranche and parametric insurance against hydropower flow losses.
Downloads
Downloads
Posted
License
Copyright (c) 2026 Puja Kharel, Aashish Katuwal

This work is licensed under a Creative Commons Attribution 4.0 International License.